___________________________________________________ UDC 519.6 Technical mechanics, 2023, 2, 13 - 20 RELIABILITY AND SAFETY OF LAUNCH COMPLEXES DOI: https://doi.org/10.15407/itm2023.02.013 Poshyvalov V. P., Daniiev Yu. F.
Poshyvalov V. P.
This paper is concerned with the reliability and safety of launch complexes. The problems to be solved in
launch complex reliability evaluation are identified: calculations of the probability of no-failure
operation of passive redundancy systems with equal- and nonequal-reliability elements, reliability
analysis for replacement redundancy with integer multiplicity and unloaded reserve; calculations of the
probability of no-failure operation of the launch complex components in launch preparation, and
calculations of the reliability indices of a component part as a whole and a comparison of the calculated
reliability indices with the specification requirements. Since a launch complex consists both of renewable
elements and of nonrenewable ones, the reliability indices must be calculated so that one may evaluate the
reliability both of individual elements and of a system of different-type elements as a whole. These
indices are characterized by the nonfailure operation time and recovery time distributions and show the
probability of à serviceable state or a failure state of an element and a system. On condition that the
nonfailure operation time and the recovery time can be described by the Weibull distribution, expressions
are obtained for the availability factor, i.e., the probability of the launch complex being operative at
an arbitrary time, except for scheduled periods during which the launch complex is not envisaged for use.
Launch complex safety is evaluated by the probability of hazards, the identification of main ways to
mitigate their consequences, and account for weight of the consequences of possible hazards in service.
Launch complex safety indices are identified. It is shown that safety must be evaluated using indices
suitable for the practical solution of problems of the justification and assurance of specified safety
requirements against possible threats in the development of launch complexes. The adopted safety index
is the probability that each hazard that occurs in a certain time will be eliminated. A renewal process
is used to describe a random number of hazard occurrences. To determine the hazard frequency, it is
recommended to use statistical data on launch complex accident rate and reliability, logical methods
of event tree and fault tree analysis, accident simulation models, and expert judgments.
launch complexes, launch vehicles, reliability indices, safety indices, Weibull distribution
1. Degtyarev A. V., Pylypenko O. V., Gudramovych V. S., Sirenko V. N., Daniev Yu. F., Klimenko D. V., Poshivalov V. P. About the classification of launch equipment of the space launch systems for the strength standards justification. Kosm. Nauka Tehnol. 2016. V. 22. No. 1. Pp. 3-14. (in Russian).
https://doi.org/10.15407/knit2016.01.003
Copyright (©) 2023 Poshyvalov V. P., Daniiev Yu. F. Copyright © 2014-2023 Technical mechanics ____________________________________________________________________________________________________________________________ |
GUIDE FOR AUTHORS ==================== Open Access Policy ==================== REGULATIONS on the ethics of publications ==================== |